08/28/2026
Reminder that we are closed next Wednesday, Thursday, and Friday for the big renovation. We are super excited to be doing this upgrade. The floor man starts Wednesday morning sanding and cleaning before doing epoxy on the floor and up the short concrete walls. Today we finished mocking the kennels up in Michael's shop. Over 300 holes had to be drilled and about a 100 more need to be done in the concrete and kennel dividers once the epoxy is done. When all our doggies return on the 8th they'll be in their fancy new digs. The new kennels isle way is wider in the "Dog House" then in these pictures, this was just the mock up to get them assembled and ready for installation.