05/24/2026
Ceiling panel is up, along with 2 of the 4 wall panels. Next will be the last 2 wall panels (covering the doors), molding/trim pieces, then onto the bed and getting the kitchen box in place! Hoping to be camping soon, stay tuned !!! 😁
My 55+ Life is all new in 2026. Stay tuned as I build a micro camper van and begin to explore and adventure with my two dogs as we navigate life over 55.
Sequoia Road
Moses Lake, WA
98837
Be the first to know and let us send you an email when My 55+ Life posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.
Send a message to My 55+ Life: