14/10/2026
Removal of old Arena surface and installation of new Sand and fibre. Part two of this project was to create a wraparound turnout Pen behind the Stable and installation of 24‘ x 12‘ field shelter with slip rail division. This will certainly stop your spring and summer paddocks being destroyed over the winter months.