Finally completed this shower. Definitely kicked my but. But loved every step and learned a few new tricks. Removed everything back to the studs and floor joists. Removed the rotten studs and sub floor and replaced with new. The window and water lines were relocated. New drywall to ceiling and walls. Added alcove to corner for new built in ( still to come) for added storage. New LVP flooring and Schluter waterproof wall and base systems installed with added wall niches. Finally tiled with 2.5” x 9.5” ceramic tiles in a herring bone pattern. Wrapping up with a new vanity and built in storage unit with quartz tops ( just finishing these up in the shop) to add a brand new space to this family home. Very grateful to be trusted with this work. Something I take to heart with great pride! A very special thanks to Jayme and Stephanie for there patience! As always as it seems, it took 3x longer than anticipated!